232 kWp photovoltaic system in Trento
Project details
232 kWp PV system with panels installed on a barrel roof.
Repowering carried out on an existing system: replacing the “old” panels allowed for the recovery of physical space to install new power. Operation financed through a guarantee of productivity recovery in subsequent years.
The project, dedicated to a company in Trento, involved the installation of 474 400-watt panels for the barrel roof and 86 490-watt panels for ballast and flat roof.
You may also be interested in
Request more information